Restoration Project 2026

9th July – The Porch! The next stage of the original project is about start. The re-enforced scaffolding including extra trusses and lifting beam have been installed. This will enable the heavy stones at the top of the porch to be lifted down. It will then be dis-assembled down to the bottom of the windows … Continue reading Restoration Project 2026